Monthly Archives: March 2012

Filtered Project Server Dashboards with PerformancePoint (Part 3)

A couple years ago, when Project Server 2010 was first released, I was sitting in a room with a member of the product team and I asked him what he felt was the most powerful feature of Project Server.  With … Continue reading

Posted in BI, Reporting | Tagged | Leave a comment

Filtered Project Server Dashboards with PerformancePoint (Part 2)

In this post, I’ll talk about how to add a drop down filter to a newly created PerformancePoint dashboard.  This is a follow up to the BI presentation that Mike McLean and I delivered at the Project Conference last week. … Continue reading

Posted in BI, Reporting | 1 Comment

Filtered Project Server Dashboards with PerformancePoint (Part 1)

Following up from last week’s Project Server Conference, this was one of the demos that Mike and I did in our second BI session – the one on Wednesday afternoon.  In this demo, we showed how you could take much … Continue reading

Posted in BI, Reporting | Tagged | 2 Comments

Storing Custom Timescaled Data with VBA

Regular readers of this blog may recall a series of posts from January where I discussed how to use VBA to store timescaled BCWP values in the Baseline10Cost field.  At the time, I’d mentioned that the same technique could be … Continue reading

Posted in BI, VBA | Tagged | 1 Comment

Project Server Business Intelligence Resources (Part 3)

Continuing with the linkfest from my previous two posts as the wrap up from the Project Conference this week in Phoenix. In this post, I’ll include links to the instructions for demos for PerformancePoint, PowerPivot and VBA Trend Analysis.  Note … Continue reading

Posted in BI, Reporting | Tagged | 4 Comments

Project Server Business Intelligence Resources (Part 2)

Thanks again to all of the folks who attended the sessions I presented with Mike McLean at the Project Conference.  This post is a follow up to those presentations, and includes links to additional reference material as well as links … Continue reading

Posted in BI, Reporting | Tagged | 4 Comments

Project Server Business Intelligence Resources (Part 1)

Thanks again to all of the folks who attended the sessions I presented with Mike McLean at the Project Conference.  This post is a follow up to those presentations, and includes links to additional reference material as well as links … Continue reading

Posted in BI, Reporting | Tagged | 3 Comments